Cost Estimation & Quantity Take-Off
Services in the Philippines

Cost estimation and quantity take-off (QTO) is the systematic measurement and pricing of a project’s materials and works. 828 Engineering Services prepares material take-offs, detailed cost estimates, and Bills of Quantities for mechanical, electrical, plumbing, and fire protection systems helping clients set budgets, evaluate bids, and control costs.

Scope of Services

  • Material Take-Off (MTO)
  • Quantity Take-Off (QTO)
  • Preliminary and detailed cost estimates
  • Bill of Quantities (BOQ) preparation
  • Budgetary cost analysis
  • Cost planning and cost control
  • Coverage across mechanical, electrical, plumbing, fire protection, and infrastructure/utility works
Cost Estimation & QTO

Codes & Standards Applied

Estimates follow industry standard measurement methodologies and are based on design drawings, technical specifications, and project requirements.

Compliance is designed in from day one so drawings clear permitting review and systems pass inspection without redesign.

Sectors served

Where This Service Wins

Restaurants

Standalone buildings and commercial fit outs, engineered for kitchens that never stop.

Coffee Shops

Brand standard MEPF across standalone and retail fit out store formats.

Schools & Institutions

Integrated systems and permit to IFC deliverables for institutional buildings.
FAQ

Frequently Asked Questions

When should cost estimation start on a project?

As early as possible. Preliminary estimates during planning set realistic budgets; detailed estimates during design keep the budget honest; and BOQs at tender let you compare contractor bids on equal terms.

A Material Take-Off lists materials; a Quantity Take-Off measures all quantities of work; a Bill of Quantities organizes those quantities into a priced tender document. We prepare all three from your design drawings and specifications.

Yes. MEPF trades are our specialty we estimate mechanical, electrical, plumbing, and fire protection works as a standalone package or alongside infrastructure and utility works.

Yes. Our estimates give you an independent benchmark to evaluate bids against, and we can review contractor quantities and rates for discrepancies during procurement.

Planning a project?

Get a fee proposal within 48 hours. Send us your drawings or a short project brief and we will respond with scope, timeline, and fees.

Contact Us

Reach Out to Us

We’d like to listen and find out what you’re looking for and what your challenges are. To get started, fill out the form, we respond to proposal requests within 48 hours.

Get in Touch

19 Magsaysay St., Parang, Marikina City, Metro Manila, 
Philippines 1809

Phone: +63 960-420-9863

Email: info@828engineering.com