Case study · Hospitality

Boracay Ocean Club

4-storey hotel building, Boracay Island, Aklan.

5 storeys

Hotel

Boracay Island, Aklan

Boracay Island

Representative image actual project photography to follow.

Project overview

The Project

Boracay Ocean Club is a 4-storey hotel building on Boracay Island, Aklan. Beachfront hospitality buildings of this scale demand MEPF systems that deliver uninterrupted guest comfort while operating within the island’s utility and environmental constraints.

The engagement covered the full MEPF design scope for the hotel: air conditioning and ventilation for guest rooms and public areas, electrical distribution and lighting, water supply and drainage, and fire protection systems for hotel occupancy.

Sectors served

Scope Delivered

Mechanical

Guest room air conditioning, fresh air and exhaust ventilation for public areas and back-of-house, and load calculations tuned to coastal tropical conditions.

Power distribution and panel schedules, interior and exterior lighting, grounding and lightning protection appropriate for a beachfront structure.

Domestic water distribution with storage and pumping provisions, sanitary and wastewater systems, and storm drainage.

Sprinkler and extinguisher coverage with standpipe provisions per hotel occupancy requirements.

Engineering considerations

Challenges & Considerations

Salt-laden coastal air accelerates corrosion of exposed equipment, island power supply demands standby planning, and Boracay’s post-rehabilitation environmental regime places wastewater handling under close scrutiny. Buildings of this type require corrosion-conscious equipment placement and specification, resilient water storage design, and drainage engineering that satisfies the island’s environmental compliance requirements.

Outcome

Value Delivered

A complete hotel MEPF package engineered for guest comfort, regulatory compliance, and dependable operation in one of the country’s most environmentally supervised destinations.

Related services

Planning a similar project?

Tell us about your building we’ll return a fee proposal within 48 hours with scope, timeline, and fees.

Contact Us

Reach Out to Us

We’d like to listen and find out what you’re looking for and what your challenges are. To get started, fill out the form, we respond to proposal requests within 48 hours.

Get in Touch

19 Magsaysay St., Parang, Marikina City, Metro Manila, 
Philippines 1809

Phone: +63 960-420-9863

Email: info@828engineering.com