Case study · Schools & Institutions

ISAT Research Hub

4-storey laboratory school, Western Visayas College of Science

 and Technology, La Paz, Iloilo City.

4 storeys

Laboratory School

La Paz, Iloilo City

ISAT Research Hub

Representative image – actual project photography to follow.

Project overview

The Project

The ISAT Research Hub is a 4-storey laboratory school located inside the Western Visayas College of Science and Technology campus in La Paz, Iloilo City. Laboratory buildings layer specialized ventilation, power, and safety requirements on top of standard institutional design.

The engagement covered the complete MEPF design for classrooms, laboratories, and support spaces, coordinated with the campus’s existing site utilities and delivered as a full permit-to-construction documentation package.

 
Sectors served

Scope Delivered

Mechanical

Classroom and laboratory air conditioning, fresh air and exhaust ventilation appropriate for laboratory activities, and plant/equipment layouts.

Power distribution with laboratory equipment provisions, interior and emergency lighting, panel schedules and single-line diagrams, and data/CCTV/security provisions.

Domestic water supply, laboratory plumbing provisions, water storage and pumping, sanitary and storm drainage systems.

Sprinkler design, extinguisher layouts appropriate to laboratory hazards, and fire alarm coordination.

Engineering considerations

Challenges & Considerations

Buildings of this type require laboratory exhaust designed so experiments don’t compromise indoor air quality elsewhere, electrical capacity for evolving research equipment, and life-safety design that treats students as the priority occupants. Integration with existing campus utilities, tying into established power, water, and drainage networks without disrupting the operating college, is a defining constraint of campus infill projects.

Outcome

Value Delivered

A coordinated institutional MEPF package supporting laboratory teaching and research, engineered for occupant safety, campus utility integration, and long-term facility performance.

Related services

Planning a similar project?

Tell us about your building, we’ll return a fee proposal within 48 hours with scope, timeline, and fees.

Contact Us

Reach Out to Us

We’d like to listen and find out what you’re looking for and what your challenges are. To get started, fill out the form, we respond to proposal requests within 48 hours.

Get in Touch

19 Magsaysay St., Parang, Marikina City, Metro Manila, 
Philippines 1809

Phone: +63 960-420-9863

Email: info@828engineering.com